INVENTORY CONTROL:

  • In inventory control our aim is to manage inventory in such a manner that day to day working run smoothly without any delay but at the minimum of cost.
 

Type of inventory costs:

 byjusexamprep

(i) Purchase Cost:

It is the cost of purchasing inventory it depends upon quantity or bulk purchased.

byjusexamprep

(ii) Ordering Cost:

byjusexamprep

(iii) Set up cost:

 byjusexamprep

(iv) Holding or Carrying Cost:

byjusexamprep

(v) Shortage or Stock out cost:

 byjusexamprep

Types of inventory:

(i)Transit or Pipeline: Inventory can’t provide service while in transportation such inventory is called transit inventory.

(ii)Buffer or safety stock

byjusexamprep

It is the reserve stock kept throughout the year and it is held for protecting against the fluctuation in the demand rate and lead time.

Lead Time: It is the time gap between placing an order and inventory on-hand so that it can be used or consumed.

(iii)Seasonal Inventory: The demand of the inventory changes with seasons of the year.

(iv)Anticipation inventory:

The inventory is build-up to meet anticipated demand in the future like big selling forecast, govt. policy change, price hike, strike shut down etc.

(v) Decoupling inventory: It is extra inventory kept between two interdependent operations or workstations and it works as a buffer during breakdown and maintenance.

Characteristic of Inventory Model:

Dependent:

The demand for these item is directly related or linked to any other item, usually of a higher level of which it becomes a part.

Independent:

The demand for this items is not directly related or linked to any other item it is difficult to compute and it is projected with the help of forecasting.

byjusexamprep

Deterministic & Probabilistic:

Deterministic:

In these model demand rate and lead time remain fixed and constant and therefore we need not to carry safety stock.

Probabilistic:

This model represents real-world condition where there is variation and fluctuation in the demand rate and lead time. In this model we need to carry safety stock to prevent stock out.

Notations:

D : Annual or yearly demand of inventory (units/year)

Q : Quantity to be ordered at each order point (units/order)

N : Number of orders placed in a year (order/year).

T : Time length of one inventory cycle or time gap between 2 successive order (year/order)

 [same unit]

C : Cost of purchasing one unit of inventory (Rs/unit)

C0 : Cost of placing one order (Rs/order)

Ch : Cost of holding one unit in inventory for one complete year (Rs/unit/year)

TYPE OF INVENTORY MODELS:

Deterministic Models or Economic Order Quantity or Harris Wilson model or Infinite Rate of Replenishment

byjusexamprep

byjusexamprep

The ordering quantity Q* where holding cost becomes equal to ordering cost and total inventory cost is minimum is known as economic order quantity [EOQ].

byjusexamprep

byjusexampreponly for EOQ

When holding cost is given in terms of interest or % it always correspond to unit price of inventory and interest rate should be always yearly.

byjusexamprep

EOQ with price break or Quantity discount:

byjusexamprep

byjusexamprep

In this problem, first we compute feasible EOQ and then total cost is computed at EOQ and next higher order size having price break whenever the total cost comes out to be minimum gives the best order size.

Production or Build up model:

byjusexamprep

Q : Quantity to be produced/manufactured in every set up (unit/setup)

C0 : (Rs/setup) cost of each set up

tP : production/manufacturing time

P : production/built-up rate

d : demand/consumption rate

byjusexamprep

TVC = Setup cost (S.C.) + Holding cost (H.C.)

S.C. = No. of setup × cost/setup

byjusexamprep

byjusexamprep

byjusexamprep

Production factor > 1

byjusexamprep 

 case when P→∞

S.C. = H.C.

  Shortage or Stockout or Back order

byjusexamprep

byjusexamprep

byjusexamprep

byjusexamprep

byjusexamprep

byjusexamprep

byjusexamprep

byjusexamprep

Probabilistic Models:

byjusexamprep

Re-order level = Average demand during LT (ADDLT) + Safety Stock (SS)

byjusexamprep

Service Level Model:

This model is preferred when the different cost factor involved with inventory are not known exactly it is based upon probability theory and amount of safety stock is kept according to level of service management wants to active.

 byjusexamprep

When the demand during lead time may be approximated by a normal distribution with certain avg. and std. deviation (s), then re-order level is given by,

byjusexamprep

byjusexamprep

INVENTORY CLASSIFICATION AND CONTROL:

(i) ABC Control (Always better control)

  • In ABC control, inventory items are classified into A,B & C category depending upon their usage value.
  • It is based on Pareto law or 80 – 20 law.

byjusexamprep

  VED (Vital essential & desirable):

  • Inventory is classified on the basis of importance of inventory for the production system.

HML (High Medium & Law)

  • Inventory are classified on the basis of unit price of inventory.

SDE (Source difficult & Easy):

  • Inventory are classified on the basis of availability of inventory for the production system.

e.g. Nuclear power plant

You can avail of BYJU’S Exam Prep Online classroom program for all AE & JE Exams:

BYJU’S Exam Prep Online Classroom Program for AE & JE Exams (12+ Structured LIVE Courses)

You can avail of BYJU’S Exam Prep Test series specially designed for all AE & JE Exams:

BYJU’S Exam Prep Test Series AE & JE Get Unlimited Access to all (160+ Mock Tests)

Thanks

Team BYJU’S Exam Prep

Download  BYJU’S Exam Prep APP, for the best Exam Preparation, Free Mock tests, Live Classes.

Comments

write a comment

AE & JE Exams

AE & JEAAINBCCUP PoliceRRB JESSC JEAPPSCMPPSCBPSC AEUKPSC JECGPSCUPPSCRVUNLUPSSSCSDEPSPCLPPSCGPSCTNPSCDFCCILUPRVUNLPSPCLRSMSSB JEOthersPracticeMock TestCourse

Follow us for latest updates