Question 1

Calculate the area (square meter) of the formwork required for a beam of 2 m span and cross section dimension of 400 mm x 200 mm.

Question 2

For estimation of the masonry work and excavation work, accuracy requirement in the measurement of the length as compared to thickness or width is _________.

Question 3

The final operation of finishing floors is known as

Question 4

__________ are used to press mortar and spread it uniformly.

Question 5

The assumption on which the trapezoidal formula for volume is based, is _______.

Question 6

Which of the following is the unit of measurement for the sills of windows?

Question 7

Central line method for estimation is suitable for_______.

Question 8

For building project estimate which method is generally used in PWD?

Question 9

What is the unit of measuring cornice?

Question 10

Which of the following is the most correct estimate?