Time Left - 06:00 mins
SSC_JE_CE_ESTIMATION&CASTING_QUIZ_1
Attempt now to get your rank among 188 students!
Question 1
Calculate the area (square meter) of the formwork required for a beam of 2 m span and cross section dimension of 400 mm x 200 mm.
Question 2
For estimation of the masonry work and excavation work, accuracy requirement in the measurement of the length as compared to thickness or width is _________.
Question 3
The final operation of finishing floors is known as
Question 4
__________ are used to press mortar and spread it uniformly.
Question 5
The assumption on which the trapezoidal formula for volume is based, is _______.
Question 6
Which of the following is the unit of measurement for the sills of windows?
Question 7
Central line method for estimation is suitable for_______.
Question 8
For building project estimate which method is generally used in PWD?
Question 9
What is the unit of measuring cornice?
Question 10
Which of the following is the most correct estimate?
- 188 attempts
- 0 upvotes
- 0 comments
Tags :
AE & JE ExamsNov 23AE & JE Exams