Question 1

Calculate the primary estimate including contractor’s profit in rupees for the building having a plinth area of 1,500 square meters and a rate of Rs.2,000 per square meter.

Question 2

Which of the following is a factor for obsolescence of the property?

Question 3

For building project estimate which method is generally used in PWD?

Question 4

The technique of finding the fair price of an existing building or property is known as ______.

Question 5

Reinforcement bars are spaced at 150 mm centre to centre spacing in a slab spanning 4500 mm. Calculate the number of bars in the slab.

Question 6

The hook is provided at the end of stirrup to

Question 7

Accuracy in the measurement of the thickness of the slab or sectional dimension of column and beam (in centimetre) should be _____.

Question 8

What is the unit of measuring cornice?

Question 9

For 45˚ bent up bar, the additional length for one bent up is

Question 10

The concrete work for the following part of the building of specified thickness is measured in square meters ______.