SSC_JE_CE_Estimating, Costing and Valuation Booster Quiz -7

Attempt now to get your rank among 245 students!

Question 1

The cross-sections for a highway is taken at _________.

Question 2

The assumption on which the trapezoidal formula for volume is based, is _______.

Question 3

The item of steel work is measured sq. m is _______

Question 4

Which department looks after the execution and maintenance of water supply and sanitary works?

Question 5

Whenever the whitewashing or distempering is done on corrugated iron sheets, in the estimation the plan area of the sheets is increased by ________.

Question 6

Which of the following estimate is carried out if the sanctioned estimate exceeds 5% due to the change in the price?

Question 7

For estimation of the brick masonry, no deduction is made for the end of the rafter up to the area (square inch) of

Question 8

Which of the following is NOT included in the floor area?

(1) Clear coverage area

(2) Area of the walls

(3) Sills of the doors

(4) Sills of the windows

Question 9

Which of the following is the unit of measurement for the sills of windows?

Question 10

What percentage of total cost is added to the schedule of rates of the public work department for over-head cost?