Time Left - 06:00 mins

SSC_JE_CE_Building Materials Booster Quiz -8

Attempt now to get your rank among 474 students!

Question 1

According to IS specifications, the compressive strength of ordinary Portland cement after three days should not be less than:

Question 2

The initial setting time for Ordinary Portland cement as per IS specifications should not be less than:

Question 3

What is the amount of water used to conduct the initial setting time test of cement which has a standard consistency of P.

Question 4

What is the water-cement ratio (w/c) required to complete the reactions in hydration of cement?

Question 5

What is the temperature range in the cement kiln?

Question 6

Which of the following shows the CORRECT expression for target mean strength (fcm) of concrete, if the characteristic strength and standard deviation is given by fck and σ respectively?

Question 7

Higher the cement content,

Question 8

For batching 1:3:6 concrete mix by volume, which of the following are the ingredients required per bag of 50kg cement?

Question 9

For which of the following process Boucherie process is used?

Question 10

What is the gel-space ratio of a sample of concrete, if the concrete is made with the 600 g of cement with the water-cement ratio of 0.65?
  • 474 attempts
  • 1 upvote
  • 8 comments
Nov 4AE & JE Exams