Time Left - 06:00 mins
SSC JE ME QUIZ_ Industrial Engineering Booster Quiz-10
Attempt now to get your rank among 55 students!
Question 1
For a linear programming problem defined on 6 jobs and 6 persons, the no. of feasible solutions are ___.
Question 2
In a transportation problem, a solution is a basic feasible solution if after allocations,
Question 3
Consider the following statements:
In a single-server queueing model
1). the arrivals is a memoryless process
2). the arrivals is described as a Poisson distribution
3). uncertainty concerning the demand for service exists.
Which of the above statements are correct __________?
In a single-server queueing model
1). the arrivals is a memoryless process
2). the arrivals is described as a Poisson distribution
3). uncertainty concerning the demand for service exists.
Which of the above statements are correct __________?
Question 4
PERT is
Question 5
Sum of buffer stock, reserve stock and safety stock is equal to
Question 6
Consider the following statements:
Exponential smoothing
1). is a modification of moving average method
2). is a weighted average of past observations
3). assigns the highest weightage to the most recent observation
Which of these statements are correct?
Exponential smoothing
1). is a modification of moving average method
2). is a weighted average of past observations
3). assigns the highest weightage to the most recent observation
Which of these statements are correct?
Question 7
Six-Jobs A to F are processed on two Machines-I and II as shown in the figure.
Find the sequence of jobs which minimizes the processing time:
Question 8
The following is the preliminary stage of Production planning
Question 9
A statistical process control chart which shows the number of defects found in a subgroup of fixed size is ________.
Question 10
An assignment problem consists of 4 rows and 4 column. The number of variables and number of constraints respectively are
- 55 attempts
- 0 upvotes
- 1 comment
Nov 3AE & JE Exams