Time Left - 06:00 mins
SSC JE ME Quiz_ Industrial Engineering Booster Quiz-7
Attempt now to get your rank among 54 students!
Question 1
For the following linear programming problem:
Maximize Z = 4x1 + 6x2
Subjected to constraints
The solution to the problem is ______.
Question 2
To convert into assignment problem a maximization problem
Question 3
In queuing theory inter arrival rate follow which kind of distribution __________?
Question 4
PERT analysis is based on
Question 5
Which of the following is not an inventory?
Question 6
General value of exponential smoothing constant in the forecasting method is?
Question 7
Gantt chart is mostly used for ________.
Question 8
CRP takes material requirements from MRP and converts to
Question 9
Lean manufacturing system works on which of 3M’s?
Question 10
A statistical process control chart which shows the number of defects found in a subgroup of fixed size is ________.