Time Left - 06:00 mins

SSC JE ME Quiz_ Industrial Engineering Booster Quiz-4

Attempt now to get your rank among 85 students!

Question 1

Decision variable in the objective function should be_____.

Question 2

According to Armand V. Feigenbaum, Which of these is not the 3 tools of Quality improvement____?

Question 3

Critical path lies along the activities having total float

Question 4

The performance of a specific task in CPM, is known

Question 5

Master schedule is prepared for

Question 6

Which of the following is true for ‘Routing’?

Question 7

Factorial design is a _______

Question 8

The variance of the activity in a PERT network with the worst and best period of 42 and 36 days respectively is _______

Question 9

In the basic EOQ Model, if the lead time increases from 10 to 20 days. The EOQ

Question 10

The breakeven point is obtained at intersection of____.