Question 1
Decision variable in the objective function should be_____.
Question 2
According to Armand V. Feigenbaum, Which of these is not the 3 tools of Quality improvement____?
Question 3
Critical path lies along the activities having total float
Question 4
The performance of a specific task in CPM, is known
Question 5
Master schedule is prepared for
Question 6
Which of the following is true for ‘Routing’?
Question 7
Factorial design is a _______
Question 8
The variance of the activity in a PERT network with the worst and best period of 42 and 36 days respectively is _______
Question 9
In the basic EOQ Model, if the lead time increases from 10 to 20 days. The EOQ
Question 10
The breakeven point is obtained at intersection of____.