SSC JE EE Quiz: Estimation & Costing Booster Quiz-10
Attempt now to get your rank among 115 students!
Question 1
What is the angle between the pole and stay?
Question 2
What should be the spacing between the two conductors if the working voltage is 11 kV?
Question 3
What are the minimum cross sections of conductors that are used for power wiring?
Question 4
How many earth connections are required for the motor frame as per the IE rule 61?
Question 5
Which among these tests are to be conducted on wiring installations?
Question 6
What does section 44 refer to?
Question 7
Which type of stress is developed in a belted type cable construction used for voltage above 22kV?
Question 8
What is the maximum span up to which the wooden poles can be used?
Question 9
A building has 3 floors and each floor has 4 fans of 50 W that operates for 12 hours a day and one air conditioner of 3000 W that operates for 2 hours per day in the month of the June. Determine the energy consumption (in kWh) of the building in June.
Question 10
Wiring clips are usually made of