Time Left - 06:00 mins

SSC JE CE QUIZ_Estimating, Costing and Valuation Booster Quiz -11

Attempt now to get your rank among 266 students!

Question 1

Pickup the incorrect statement from the following–

Question 2

Deduction at the L-junction of the wall for the total length of the central line is

Question 3

In the method of measurement of earthwork in filling in foundation trench, the filling shall be measured and ………….. of deduction will be made for settlement to arrive at the net quantities, in the case where quantity is measured in loose stacks as in carts as lorries. Fill in the blank choosing correct answer from the option, given below.

Question 4

Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds

Question 5

The value of property at the end of utility period after being dismantled is?

Question 6

No deduction is required in plastering work when area of opening is?

Question 7

A document containing detailed description of all the items of work (but their quantities are not mentioned) together with their current rates is called ______.

Question 8

A building has been purchased by a person at a cost of Rs. 25,000. The useful life of the building is 40 years and the scrap value of the building is Rs. 3,000. Calculate the annual sinking fund (Rs.) at the rate of 5% interest.

Question 9

For estimation of painting area of corrugated steel sheets, percentage increase in area above the plain area is ______.

Question 10

The information which cannot be included in drawings is conveyed to the estimator through ______.