Time Left - 04:00 mins
LMRC Civil Engineering Quiz 12
Attempt now to get your rank among 1252 students!
Question 1
If the optimistic time, most likely time and pessimistic time for activity A are 4, 6 and 8 respectively and for activity B are 5, 5.5 and 9 respectively, then
Question 2
The method of computing areas by subdividing a plot into triangles is suitable for
Question 3
A circular curve of radius R connects two straights with a deflection angle of 60 °. The tangent length is
Question 4
The reduced bearing of a 10 m long line is N30 °E. The departure of the line is
Question 5
The flow in open channel is said to be subcritical if the Froude number is
- 1252 attempts
- 4 upvotes
- 24 comments
Tags :
ESE & GATE CEGeneralJul 3ESE & GATE CE