Time Left - 06:00 mins

Irrigation Engineering Booster Quiz -3

Attempt now to get your rank among 263 students!

Question 1

In case of gravity dams, the factor of safety against overturning should not be less than

Question 2

The rate at which a soil is capable of absorbing water is called:

Question 3

The gross commanded area for a distributary is 6000 hectares, 80% of which is culturable irrigable. The intensity of irrigation for Kharif season is 25%. The area to be irrigated in Kharif season is ____ hectares.

Question 4

Which one of the following are Kharif crops?

Question 5

Auxiliary devices in stilling basins are provided

Question 6

The scour velocity of the stream is the

Question 7

Type of cross – drainage work when canal is passed below the drainage is:

Question 8

The field irrigation requirements is computed as ______.

Question 9

A field of 500 hectares is to be irrigated for a particular crop having 100 days base period. The total depth of water required by the crop is 100 cm. Calculate the duty of the water (in hectares per cumecs).

Question 10

As one moves from head of the canal to the field, the duty of the water _____.
  • 263 attempts
  • 0 upvotes
  • 1 comment
Aug 11AE & JE Exams