Time Left - 15:00 mins
GATE (CE) 2022: BUILDING MATERIALS #9 (App update required to attempt this test)
Attempt now to get your rank among 647 students!
Question 1
Correct statement regarding final setting time is
I. Final setting should not be more than 10 hours.
II. To find final setting time cement paste is made of consistency 0.85 P
III. For final setting time test annual coller is attached in place of square needle
Question 2
Match the following
Question 3Multiple Correct Options
Which of the options are correct for a 3m3 of concrete having design mix proportion of 1 : 2 : 7 (by volume)
Question 4
If in a concrete mix, the fineness modulus of coarse aggregate is 7.6, the fineness modulus of fine aggregate is 2.8 and the economic value of the fineness modulus of combined aggregate is 6.4, then the percentage proportion of coarse aggregate is
Question 5
Why is super plasticizers added to concrete?
1) To reduce the quantity of mixing water
2) To increase the consistency
3) To reduce the quantity of cement
4) To increase resistance to freezing and thawing
Select the correct answer using the codes below:
Question 6
Which defect is generally occur when excess amount of sulphur is present during the manufacturing of steel?
- 647 attempts
- 2 upvotes
- 3 comments
Nov 6ESE & GATE CE