GATE CE 2020: Construction Management Quiz 3 (App update required to attempt this test)
Attempt now to get your rank among 770 students!
Question 1
In PERT analysis of a project having large number of activities in its critical path, which of the following assumption is correct?
Question 2
In a PERT activity, the three time estimates are 2, 6,10. The variance of the activity is ____
Question 3
The probability distribution taken to represent the completion time in PERT analysis is
Question 4
For crossing the Panama Canal, a ship takes normally 25 minutes and at a maximum 50 minutes. Find out the expected time for crossing of the canal considering it as a PERT activity of variance 44.44.
Question 5
An activity is analyze using PERT , the most likely time is 3 days, optimistic time is 1day and pessimistic time is 5 days. The probable range of the duration(days) of the activity is?(Take 95% probability).
Question 6
In PERT analysis, the time estimates of activities follow