Question 1
In Materials Requirement Planning, if the inventory holding cost is very high and the setup cost is zero, which one of the following lot sizing approaches should be used?
Question 2
Which of the following is not an input for material requirement planning?
Question 3
A machine is used for turning operation and it takes 30 minutes to machine the component. Efficiency of the machine is 80% and scrap is 25%. The desired output is 1200 pieces per week. Considering 40 hours per week and 50 weeks in a year. The number of machine required in a year______.
Question 4
A production line is said to be balanced when
Question 5
A 5 station assembly line has allotted times 7, 9, 8, 6 and 5 minutes respectively. What is the balance delay __________?
Question 6
An electronic equipment manufacturer has decided to add a component subassembly operation that can produce 80 units during a regular 8-hour shift. This operation consists of three activities as below:
For line balancing the number of work stations required for the activities M, E and T would respectively be __________.