Time Left - 15:00 mins
GATE 2022 ME: Industrial Engineering Quiz - 2
Attempt now to get your rank among 446 students!
Question 1
Which of the following scheduling method is accepted by default if no other method is specifically mention while solving problems in scheduling to maintain the flow of job smooth.
Question 2
The objective of sequencing problem is:
Question 3
A set of 5 jobs is to be processed on a single machine. The processing time (in days) is given in the table below. The holding cost for each job is Rs. K per day.
A schedule that minimizes the total inventory cost is
A schedule that minimizes the total inventory cost is
Question 4
Four jobs 1, 2, 3,... 4 are to be processed on a single machine. The processing times, due dates are represented in table. The ratio of mean flow time for shortest processing time rule to earliest due date rule is ______.
Question 5
For the data given below:
Use the Jackson’s Extension to calculate the total processing time.
Use the Jackson’s Extension to calculate the total processing time.
Question 6
Service workshop has four jobs on hand to be processed. The date and processing time for each of the jobs are given below:
Using the shortest processing time (SPT) rule, total tardiness is
Using the shortest processing time (SPT) rule, total tardiness is
- 446 attempts
- 0 upvotes
- 0 comments
Sep 27ESE & GATE ME