Time Left - 06:00 mins

Estimating, Costing and Valuation Booster Quiz -5

Attempt now to get your rank among 295 students!

Question 1

The top and bottom cover in beams in estimating the quantity of steel work may be taken as

Question 2

Which of the following is the most correct estimate?

Question 3

Cost slope of the direct cost curve is given by

Question 4

Which of the following is the correct statement for length of the long wall as one move from earthwork to brick work in super structure in long and short wall method?

Question 5

In the estimation of plastering surface the deductions are not made for ________.

Question 6

Calculate an approximate estimate (Rs.) of the building with total plinth area of the building is 500 square meters. The rate of the plinth area is Rs. 3,000 per square meters. The costs of the water supply and contingencies are 7% and 5% of cost of construction respectively.

Question 7

Calculate the quantity (cubic meter) of the concrete used in a pier of 1.2 m diameter and 6 m length. The pier is reinforced with 8 bars of 25 mm diameter.

Question 8

Which of the following is measured in cubic meter?

Question 9

The IS code used for bar bending schedule is

Question 10

The bar bending schedule is prepared to
  • 295 attempts
  • 1 upvote
  • 1 comment
Dec 6AE & JE Exams