Time Left - 06:00 mins

Estimating, Costing and Valuation Booster Quiz -4

Attempt now to get your rank among 182 students!

Question 1

In Construction Management, the Critical Path Network helps an engineer

Question 2

Slack time in PERT analysis

Question 3

A building owner receives an annual rent of Rs. 1,00,000. The total annual cost of repairs is Rs. 15,000. The capitalized value of the building if the rate of interest is 5% per annum is:

Question 4

ISO 14012 provides guidance on

Question 5

Vibrating compactor is ideally suited for

Question 6

The value of dismantled materials:

Question 7

Select the number of type of construction according to fire resistance properties as per National building code of India

Question 8

Match List-I with List-II and select correct answer:

List-I

(a) Excavation and moving

(b) Pure excavation

(c) Pure transportation

(d) Pure hoisting

List-II

1) Derrick

2) Dump truck

3) Power shovel

4) Scrapers

Question 9

As per IS 1200, in the measurement of brickwork, no deductions shall be made for

Question 10

Excavation exceeding 1.5 m in width as well as 10 m2 on plan but not exceeding 30 cm in depth shall be described as