CG Vyapam_CE Survey Quiz-1

Attempt now to get your rank among 126 students!

Question 1

Consider the following surveys involved in the selection of alignment of a road:

1) Map study

2) Preliminary survey

3) Reconnaissance

4) Detailed survey

The correct sequence of these survey is

Question 2

If 1 acre equals 100m2 and 100 hectare equals 1km2, then 1km2 equals ……..m2.

Question 3

In geodetic survey, all plumb lines are

Question 4

The operation of revolving a plane table about its vertical axis so that all lines on the sheet become parallel to corresponding lines on the ground is known as

Question 5

The horizontal distance between two points on two consecutive contours is known as:

Question 6

Which of the following conditions require Geodetic Surveying?

Question 7

The maximum tolerance in overall length of a 20 m and 30 m metric chain should be respectively

Question 8

A triangulation station selected close to the main station for avoiding intervening obstruction is called

Question 9

Subsidiary station established as near the true triangulation station as possible is known as:

Question 10

With an increase in the denominator of the representative fraction, the scale of the map will _____.