Time Left - 06:00 mins

CG Vyapam_CE Environmental Quiz-6

Attempt now to get your rank among 62 students!

Question 1

In biological wastewater treatment process, which option matches List I with List II correctly from the given codes?

Question 2

A fresh sludge has moisture content of 98% and after thickening its moisture content is reduced to 97%. The reduction in volume of sludge is

Question 3

The purpose of proportional weir at the effluent end of a channel type grit removal unit is to?

Question 4

In a high rate trickling filter, the problem of ponding can be solved by

Question 5

Select the correct sequence of different phases of biomass curve:

Question 6

High COD to BOD ratio of an organic pollutant represents :

Question 7

An anaerobic reactor, operated at 35°C, treats wastewater with a flow of 200 m3/d and a biological soluble COD (bsCOD) concentration of 500 g/m3. At 90% bsCOD removal and a biomass synthesis yield of 0.04 g Volatile Suspended Solids/g bsCOD used, calculate amount of COD consumed (in kg/d)?

Question 8

Calculate contribution of removal of phosphorous in primary settling tank to overall removal in wastewater treatment plant? Plant schematic is: influent water Primary settling tank Biological aeration tank Secondary settling tank Effluent water.

Question 9

Sludge treatment is mainly done in order to:

Question 10

The units in which both sedimentation & digestion process of sludge take places simultaneously is
  • 62 attempts
  • 0 upvotes
  • 0 comments
Jul 15AE & JE Exams