Question 1
What is the height of a slump cone mould used for testing the workability of the concrete?
Question 2
Which of the following is a sedimentary rock?
Question 3
The minimum stripping time of soffit formwork to beams (props to be reflexed immediately after removal of formwork) is:
Question 4
Quartzite is formed due to the metamorphism of
Question 5
Arrange the following minerals in the increasing order of their hardness:
1) Talc
2) Calcite
3) Quartz
4) Diamond
Question 6
Match the following
Question 7
Scrap value and is 1/16 time the actual cost. What will be value of annual depreciation if life of of property is 24 months ( Use Constant Percentage Method)
Question 8
No deduction is made in the quantity estimation for plastering work in cement mortar for openings having size up to:
Question 9
What is the correct sequence of preparing an estimate?
1) Detailed estimate
2) Approximate estimate
3) Supplementary estimate
4) Revised estimate
Question 10
Match the following