Time Left - 06:00 mins

AE-JE Foundation CE: Revision Quiz : Building Materials and Construction Management

Attempt now to get your rank among 654 students!

Question 1

What is the height of a slump cone mould used for testing the workability of the concrete?

Question 2

Which of the following is a sedimentary rock?

Question 3

The minimum stripping time of soffit formwork to beams (props to be reflexed immediately after removal of formwork) is:

Question 4

Quartzite is formed due to the metamorphism of

Question 5

Arrange the following minerals in the increasing order of their hardness:

1) Talc

2) Calcite

3) Quartz

4) Diamond

Question 6

Match the following

Question 7

Scrap value and is 1/16 time the actual cost. What will be value of annual depreciation if life of of property is 24 months ( Use Constant Percentage Method)

Question 8

No deduction is made in the quantity estimation for plastering work in cement mortar for openings having size up to:

Question 9

What is the correct sequence of preparing an estimate?

1) Detailed estimate

2) Approximate estimate

3) Supplementary estimate

4) Revised estimate

Question 10

Match the following

  • 654 attempts
  • 0 upvotes
  • 6 comments
Aug 13AE & JE Exams