Question 1
Which of the following is not an input for material requirement planning?
Question 2
Just-In-Time production is also known as _______.
Question 3
For one unit of product P, 3X’s, 5Y’s and 7Z’s are required. Each X unit requires 2 M’s and 4O’s. Each Y unit requires 4T’s and 5S’s and 2Z’s. if 20 P’s are needed the no. of units of Os required are
Question 4
The standard time of an operation has been calculated as 15 min. The worker was rated at 80%. If the relaxation and other allowance were 25% and provided on the standard time, then the observed time will be _____ minutes.
Question 5
A machine is used for turning operation and it takes 30 minutes to machine the component. Efficiency of the machine is 80% and scrap is 25%. The desired output is 1200 pieces per week. Considering 40 hours per week and 50 weeks in a year. The number of machine required in a year______.
Question 6
In Materials Requirement Planning, if the inventory holding cost is very high and the setup cost is zero, which one of the following lot sizing approaches should be used?