hamburger

The Final Setting Time of Ordinary Cement should not be more than?

By BYJU'S Exam Prep

Updated on: November 9th, 2023

The final setting time of ordinary cement should not be more than ten hours. The setting time of cement incorporates the initial setting time and final setting time. The initial setting time of cement should be greater than forty-five minutes and the final setting time should be less than ten hours.

Ordinary Portland cement is the hydraulic binding substance made by blending Portland cement clinker, 6% to 15% blended materials, and the proper amount of gypsum. It is also referred to as just “ordinary cement.”

Final Setting Time of Ordinary Cement

The initial setting time of cement is the period of time during which cement can be moulded into any desired shape without losing strength. The final setting time of cement is the point at which it completely loses its plasticity and turns hard.

  • The final setting time of cement is determined by the Vicat needle test. The time that cement takes to turn into a paste by mixing with water and begins to lose its plasticity is known as the initial setting time of cement.
  • On the other hand, the time in which cement completely loses its plasticity by mixing with water and begins to have a certain structural strength is called the final setting time.
  • It takes time to put cement paste in place after mixing cement and water, and it is required that cement paste or concrete be put in place before the initial setting time has passed.
  • Initial setting time plays a major role in strength. i.e., 30 mins. And you shouldn’t disturb it until it has finished setting for the final time, which is 600 minutes for ordinary Portland cement.

Details on Cement:

Check the crucial details related to the cement below:

  • It is a finely milled mineral powder.
  • It is usually grey in color.
  • Limestone, Clay, and Marl are important raw materials for the production of cement.
  • When mixed with water it serves as an adhesive to bind gravel, sand, and hard rock in concrete.

Summary:

The Final Setting Time of Ordinary Cement should not be more than?

Ordinary cement should not have a final setting time of more than ten hours. The cement setting time includes the initial and final setting times. Cement should have an initial setting time of more than 45 minutes and a final setting time of less than ten hours.

Related Questions:

Our Apps Playstore
POPULAR EXAMS
SSC and Bank
Other Exams
GradeStack Learning Pvt. Ltd.Windsor IT Park, Tower - A, 2nd Floor, Sector 125, Noida, Uttar Pradesh 201303 help@byjusexamprep.com
Home Practice Test Series Premium