Time Left - 06:00 mins
SSC JE EE Quiz: Estimation & Costing Booster Quiz-12
Attempt now to get your rank among 82 students!
Question 1
To prevent the decaying owing to snow and rain, the wooden poles are protected by _________ cap at the top.
A) Aluminium
B) Zinc
C) Cement
A) Aluminium
B) Zinc
C) Cement
Question 2
A wire placed on the top of a transmission line acts as
Question 3
The conductor, by means of which the metal body of equipment or an application is connected to the earth, is known as
Question 4
The earthing electrodes should be placed at what minimum distance in meters from the building whose installation system is being earthed?
Question 5
Inside the earth pit, the earthing electrode should be placed
Question 6
Which section in the IE Act deals with the ‘theft of energy’?
Question 7
________ should be provided as the working space around the main switchboard according to IE rule 51.
Question 8
Energy-efficient motors generally have
Question 9
Cheapest system of wiring is
Question 10
In wiring and winding an Abbreviation for S.W.G is______?
- 82 attempts
- 0 upvotes
- 1 comment
Tags :
AE & JE ExamsJun 14AE & JE Exams