Time Left - 06:00 mins
SSC JE CE 2017- Surveying, Cost Estimation and valuation Ranker Quiz 6
Attempt now to get your rank among 4543 students!
Question 1
The concrete work for the following part of the building of specified thickness is measured in square meters ______.
Question 2
The item of steel work is measured sq. m is _______
Question 3
The technique of finding the fair price of an existing building or property is known as ______.
Question 4
Which of the following is the most correct estimate?
Question 5
The surface of zero elevation around the earth, which is slightly irregular and curved is known as ________.
Question 6
The rise and fall method of reduction of levels, provides a check on _____.
Question 7
Correction per chain length of 100 links along a slope having a rise of 1 unit in n horizontal units is ______.
Question 8
A relatively fixed point of known elevation above datum is called ______.
Question 9
Section AA indicates:
Question 10
Hydrographic survey deals with the mapping of _______.
- 4543 attempts
- 10 upvotes
- 125 comments
Dec 6ESE & GATE CE