Time Left - 08:00 mins
PSC Civil Engg: Surveying Quiz 10
Attempt now to get your rank among 1998 students!
Question 1
A line joining some fixed points on the main survey lines is called
Question 2
If h is the difference in height between end points of a chain of length the required slope correction is ______.
Question 3
The direction of steepest slope on a contour is _____.
Question 4
The difference in length of an arc and its subtended chord on earth’s surface for a distance of 18.2 km is ______.
Question 5
Number of links in a 30 m metric chain is _______.
- 1998 attempts
- 4 upvotes
- 36 comments
Tags :
ESE & GATE CESurveyingMay 17ESE & GATE CE