GATE 2023 || Industrial Engineering || Quiz 57

Attempt now to get your rank among 51 students!

Question 1

The objective of sequencing problem is:

Question 2

Gantt chart is used for _______.

Question 3

In an assembly line, what is the balance delay?

Question 4

Sequencing of n jobs in two machines can be done by adopting which of the following methods

Question 5

Service workshop has four jobs on hand to be processed. The date and processing time for each of the jobs are given below:
21.jpg
Using the shortest processing time (SPT) rule, total tardiness is

Question 6

A product is assembled at 3 different at workstation. If station time is 5, 6 and 9 minutes and cycle time is 11 minutes. Find the line efficiency and the smoothness index of the assembly ___________.