Time Left - 15:00 mins

GATE 2023 Building Materials & Construction Management Quiz 39

Attempt now to get your rank among 21 students!

Question 1

If the expected time for completion of a project is 10 days with a standard deviation of 2 days, the expected time of completion of the project with 99.9% probability is

Question 2

Which one of the following statements is not correct?

Question 3

PERT calculations yield a project length of 60 weeks with a variance of 10 weeks. Probability factor corresponding to 95% probability is 1.65; Then the number of weeks required to complete the project with a probability of 95% is:

Question 4

Which of the following activity, the slack is zero? (time durations are in days).

Question 5

The line of a PERT network is shown below with a, m, b durations. What is the probable range of the total duration?

Question 6

The time estimates obtained from 4 contractors P, Q, R and S for executing a job are as below:

Which of them is more certain about completing the job in time?

  • 21 attempts
  • 0 upvotes
  • 0 comments
Jun 9ESE & GATE CE