GATE 2019 Construction Management Day 2 Quiz

Attempt now to get your rank among 1263 students!

Question 1

In a CPM network the activity is non critical if

Question 2

The difference between PERT and CPM is that

Question 3

Consider the following statements:
(i) In CPM floats are calculated where as in PERT slacks are used.
(ii) Project crashing can be carried out for both the CPM and PERT
(iii) In PERT probabilistic approach is considered.
(iv) Both PERT and CPM are used for project scheduling
Which one of the following is correct?

Question 4

A): An Activity is critical if total float is zero.
B): Earliest finish time and latest finish time for events of the critical activity are same
Select the correct answer.

Question 5

Based on the network diagram choose the correct tabular representation:

Question 6

Match List-I (Item) with List-II (Features) and select the correct codes